What we did:
- Opened wall cavities at the source and protected unaffected areas
- Selective demo of wet materials; baseboard/trim removal where required
- Air movers + dehumidification for structural dry‑out
- Daily readings until dry standards were reached
Trusted. Transparent. Local.




